ADVERTISEMENT
Trial run of Green Metro
DHNS
Last Updated IST

The Bangalore Metro Rail Corporation Limited (BMRCL) is likely to conduct a trial run of Green Line metro between Peenya and Nagasandra along Reach-3 of Namma Metro, on March 9.

The Reach 3 - north line of Namma Metro extends from Sampige Road in Malleswaram to Peenya. A trial run on the testing track in Peenya up to the upper ramp at the Peenya station was conducted a few months ago.

“On Saturday, the trial run will be held for three kilometre,”said a BMRCL official.

ADVERTISEMENT
(Published 02 March 2013, 00:49 IST)