'People dumping debris under Metro lines'

'People dumping debris under Metro lines'

The Bangalore Metro Rail Corporation Limited (BMRCL) officials claim that it is the residents who are dumping debris in the Metro construction sites.

For example, the work on BMRCL's Reach 4 from National College to Metro Cash and Carry on Kanakapura Road has stopped for over a year, with some finishing works going on inside the stations. But at some places, construction materials and debris still line the roads and medians beneath the tracks.

While residents are peeved over the traffic bottlenecks caused by the debris, slush and dirt especially after rains, officials claim that the construction material and debris do not belong to the Metro. They say it is the local residents who are dumping debris beneath the tracks, but the BMRCL is blamed.

As soon as the works are completed, roads are being readied. Tenders have already been allotted for maintenance and beautification of medians for the whole of Phase I, say BMRCL officials.

Narendra Modi or Rahul Gandhi? Who will win the battle royale of the Lok Sabha Elections 2019


Get real-time news updates, views and analysis on Lok Sabha Elections 2019 on Deccanherald.com/news/lok-sabha-elections-2019 


Like us on Facebook or follow us on Twitter and Instagram with #DHPoliticalTheatre for live updates on the Indian general elections 2019.

Liked the story?

  • 0

    Happy
  • 0

    Amused
  • 0

    Sad
  • 0

    Frustrated
  • 0

    Angry