<p>Bengaluru: The city's first double-decker featuring a <a href="https://www.deccanherald.com/tags/metro">metro</a> line above a flyover is set to open fully in the coming days. </p>.<p>On Thursday, senior traffic police officials and BMRCL engineers inspected the flyover's Ramps D and E, which will connect HSR Layout with Ragigudda and <a href="https://www.deccanherald.com/tags/btm-layout">BTM Layout</a>. Ramp D runs below the metro's Yellow Line. </p>.New flyover planned at Bengaluru's Iblur to ease ORR traffic.<p>The ramps were delayed due to the installation of a 42-metre steel girder, but the work has recently been completed. </p>.<p>Once operational, the flyover will allow traffic to bypass Silk Board, reducing congestion at the notorious junction. </p>.<p>The ramps connecting Ragigudda to Hosur Road, BTM Layout and HSR Layout, opened in July 2024. </p>
<p>Bengaluru: The city's first double-decker featuring a <a href="https://www.deccanherald.com/tags/metro">metro</a> line above a flyover is set to open fully in the coming days. </p>.<p>On Thursday, senior traffic police officials and BMRCL engineers inspected the flyover's Ramps D and E, which will connect HSR Layout with Ragigudda and <a href="https://www.deccanherald.com/tags/btm-layout">BTM Layout</a>. Ramp D runs below the metro's Yellow Line. </p>.New flyover planned at Bengaluru's Iblur to ease ORR traffic.<p>The ramps were delayed due to the installation of a 42-metre steel girder, but the work has recently been completed. </p>.<p>Once operational, the flyover will allow traffic to bypass Silk Board, reducing congestion at the notorious junction. </p>.<p>The ramps connecting Ragigudda to Hosur Road, BTM Layout and HSR Layout, opened in July 2024. </p>