Central Pollution Control Board notice to Kalaburagi cement plant
he CPCB notice said that while the factory had installed continuous emission monitoring systems (CEMS) in five stacks, the CEMS for particulate matter (PM), sulfur dioxide (SO2) and nitrogen oxides (NOx) was not installed in the stack attached to the boiler with a 130 tonne per hour capacity.