
An image of a paper written penalty on it.
Credit: iStock
Bengaluru: The Bengaluru Smart Infrastructure Ltd (B-SMILE) on Friday fined two contractors — JMC Constructions and Ocean Constructions — Rs 2 lakh each for delay in completing white-topping works.
The penalty was issued after Chief Secretary Shalini Rajneesh pulled up civic officials over the slow progress of works along the Outer Ring Road and nearby stretches.
The Chief Secretary has reportedly directed B-SMILE to complete all white-topping works by November.