ADVERTISEMENT
Two BBMP officials suspended over poor roads, drains in East Zone
Sneha Ramesh
DHNS
Last Updated IST
The order noted that the engineer was responsible for desilting stormwater drains and had increased responsibilities during the rainy season. Credit: DH Photo/S K Dinesh
The order noted that the engineer was responsible for desilting stormwater drains and had increased responsibilities during the rainy season. Credit: DH Photo/S K Dinesh

The BBMP on Monday suspended an executive engineer (Road Infrastructure), East Zone, for failing to fill up potholes effectively.

The civic body also acted on the executive engineer (Storm Water Drains) in the same zone over failure to desilt stormwater drains.

In his order, Bruhat Bengaluru Mahanagara Palike (BBMP) Special Commissioner (Admin) K A Dayanand said the executive engineer (Road Infrastructure) caused inconvenience to the public by failing to fill up potholes on various roads.

ADVERTISEMENT

The executive engineer (SWD) has been suspended for failing to turn up for duty without intimating higher authorities. The order noted that the engineer was responsible for desilting stormwater drains and had increased responsibilities during the rainy season. The engineer is found to be failing in his duties by absenting from work.

Check out latest DH videos here

Deccan Herald is on WhatsApp Channels | Join now for Breaking News & Editor's Picks

ADVERTISEMENT
(Published 09 November 2021, 00:40 IST)