<p>Bengaluru: The long-anticipated statutory safety inspection of Namma Metro's Yellow Line began on Monday. </p>.<p>AM Chowdhary, Commissioner of Metro Railway Safety (Southern Circle), commenced the motor trolley inspection from the RV Road station around 10 am. </p>.<p>He was accompanied by Sumit Bhatnagar, Director (Rolling Stock and Electrical) at Bangalore Metro Rail Corporation Limited (BMRCL). </p>.<p>Over the three-day exercise, the CMRS will inspect various components of the Yellow Line, including the viaduct, tracks, platforms, station buildings, signalling and electrical systems, fire safety measures, air-conditioning, escalators, lifts, automatic fare collection (AFC) systems, etc. </p>.Bengaluru: Namma Metro's Yellow Line safety inspection from July 22 to 25.<p>On July 25, he is scheduled to visit the BMRCL's Operations Control Centre (OCC) at the Baiyappanahalli depot. </p>.<p>The CMRS is expected to give his report, which is almost always conditional, in about a week afterwards. </p>.<p>The BMRCL will need about a week or so to fulfill the conditions and submit a compliance report. It has announced plans to open the 19.15-km RV Road-Bommasandra line by August 15. </p>.<p>The line may be inaugurated by Prime Minister <a href="https://www.deccanherald.com/tags/narendra-modi">Narendra Modi</a>, subject to his availability. </p>
<p>Bengaluru: The long-anticipated statutory safety inspection of Namma Metro's Yellow Line began on Monday. </p>.<p>AM Chowdhary, Commissioner of Metro Railway Safety (Southern Circle), commenced the motor trolley inspection from the RV Road station around 10 am. </p>.<p>He was accompanied by Sumit Bhatnagar, Director (Rolling Stock and Electrical) at Bangalore Metro Rail Corporation Limited (BMRCL). </p>.<p>Over the three-day exercise, the CMRS will inspect various components of the Yellow Line, including the viaduct, tracks, platforms, station buildings, signalling and electrical systems, fire safety measures, air-conditioning, escalators, lifts, automatic fare collection (AFC) systems, etc. </p>.Bengaluru: Namma Metro's Yellow Line safety inspection from July 22 to 25.<p>On July 25, he is scheduled to visit the BMRCL's Operations Control Centre (OCC) at the Baiyappanahalli depot. </p>.<p>The CMRS is expected to give his report, which is almost always conditional, in about a week afterwards. </p>.<p>The BMRCL will need about a week or so to fulfill the conditions and submit a compliance report. It has announced plans to open the 19.15-km RV Road-Bommasandra line by August 15. </p>.<p>The line may be inaugurated by Prime Minister <a href="https://www.deccanherald.com/tags/narendra-modi">Narendra Modi</a>, subject to his availability. </p>