In a release issued here, the BMRCL stated that, despite the KLAC carrying out road repair works near Swami Vivekananda Road, Halasoor to ease traffic flow, leakage of water from a pipe below is damaging the road.
“The Chief Engineer, BWSSB has been contacted. He has promised to set it right within a week, so that we could re-lay the road. There is some urgency in the matter since more parts of the newly-laid road is getting spoilt. KLAC has been asked to relay the road immediately after stopping the water leakage,” said Yashavanth Chavan B L, the BMRCL PRO.
The release added that BWSSB has completed the drainage work up to Shanthi Sagar Hotel, that were pending on CMH Road.
(Published 21 August 2009, 19:11 IST)