<p>Bengaluru: A technical glitch observed at Whitefield (Kadugodi) metro station early on Friday morning led to the disruption of metro services from that station on the Purple Line.</p>.<p>Normalcy returned only at 9:55 am, when train connectivity from the last station on the Purple Line was restored.</p>.BMRCL submits Tumakuru metro feasibility study.<p>According to the Bengaluru Metro Rail Corporation Limited (BMRCL), trains were being operated only between Hopefarm Channasandra and Challaghatta stations from 5 am on Friday. As a temporary measure, no trains were operated from the Whitefield (Kadugodi) station.</p>.<p>BMRCL said that normal services were restored only at 9:55 am. Meanwhile, services on the Green Line were unaffected.</p>
<p>Bengaluru: A technical glitch observed at Whitefield (Kadugodi) metro station early on Friday morning led to the disruption of metro services from that station on the Purple Line.</p>.<p>Normalcy returned only at 9:55 am, when train connectivity from the last station on the Purple Line was restored.</p>.BMRCL submits Tumakuru metro feasibility study.<p>According to the Bengaluru Metro Rail Corporation Limited (BMRCL), trains were being operated only between Hopefarm Channasandra and Challaghatta stations from 5 am on Friday. As a temporary measure, no trains were operated from the Whitefield (Kadugodi) station.</p>.<p>BMRCL said that normal services were restored only at 9:55 am. Meanwhile, services on the Green Line were unaffected.</p>