×
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT

Trains to be partially cancelled

Last Updated 17 February 2013, 19:47 IST

The following trains are partially cancelled for a day on February 18 as the South Western Railways has permitted a line block for 8 hours from 8 am to 4 pm, for elimination of level-crossing, by the construction of limited height road underbridge in Shimoga town-Talguppa section between Shimoga town-Kornahallti stations.

Mysore-Talguppa-Mysore Expresses (16206 / 16205) are partially cancelled between Shimoga town-Talguppa-Shimoga town stations and Mysore-Talguppa Express (16206) will run up to  Shimoga and return as Talguppa-Mysore Express (16205) from Shimoga to Mysore.

In Hubli Division

The following trains are partially cancelled / regulated as the SWR has permitted a line block between Raybag-Chinchili stations of Hubli Division for limited height road underbridges box insertion by cut and cover method from 11.30 pm on February 18 till 7.30 am on February 19.

The Miraj-Hubli Express (11047) is partially canalled between Miraj and Belgaum stations. Hubli-Miraj Express (11048) is partially cancelled between Belgaum-Miraj stations. Miraj-Londa Passenger (51431) to be regulated at Chinchili from 7.00 am to 7.30 am on February 19 and 21. Miraj-Hubli Express (11047) scheduled to leave Miraj on February 19 and 21, will move as Miraj-Londa Passenger (51431), on February 19 and 21, and continue its link.

The Hubli-Miraj Link Express (11048) scheduled to leave Hubli on February 18 and 21 will move as Dharwad-Bellary Passenger (51412) on February 19 and 21, and continue its  link.

ADVERTISEMENT
(Published 17 February 2013, 19:47 IST)

Follow us on

ADVERTISEMENT
ADVERTISEMENT