<p>The Bangalore Metro Rail Corporation Limited (BMRCL) is likely to conduct a trial run of Green Line metro between Peenya and Nagasandra along Reach-3 of Namma Metro, on March 9.<br /><br /></p>.<p>The Reach 3 - north line of Namma Metro extends from Sampige Road in Malleswaram to Peenya. A trial run on the testing track in Peenya up to the upper ramp at the Peenya station was conducted a few months ago. <br /><br />“On Saturday, the trial run will be held for three kilometre,”said a BMRCL official.<br /><br /></p>
<p>The Bangalore Metro Rail Corporation Limited (BMRCL) is likely to conduct a trial run of Green Line metro between Peenya and Nagasandra along Reach-3 of Namma Metro, on March 9.<br /><br /></p>.<p>The Reach 3 - north line of Namma Metro extends from Sampige Road in Malleswaram to Peenya. A trial run on the testing track in Peenya up to the upper ramp at the Peenya station was conducted a few months ago. <br /><br />“On Saturday, the trial run will be held for three kilometre,”said a BMRCL official.<br /><br /></p>