BWSSB to adopt solar power for Cauvery Stage VI pumping stations
The agency has prepared a Detailed Project Report (DPR) for the project, which will include four pumping stations. All stations will be partially or fully powered by solar energy, with an estimated cost of Rs 20 crore.