×
ADVERTISEMENT
ADVERTISEMENT

Vaishnaw conducts breakthrough of bullet train tunnel; says first phase to start in 2027

The tunnel, excavated with a width of 12.6 metres, has been designed to accommodate twin tracks within a single tube of 13.1 metres diameter, allowing trains to move in both directions.
Last Updated : 20 September 2025, 09:25 IST
ADVERTISEMENT

Follow Us :

Comments
ADVERTISEMENT
Published 20 September 2025, 09:25 IST

Follow us on :

Follow Us