Works on Undabatti tank begin

A pipe is being laid between the tank and the waste land opposite to the tank creating an inclination so that the water flows out after it reaches a particular height. The pipe will be laid beneath the road and a small bridge will be constructed covering the same atop.

In the earlier case, due to the lack of outlet, the water collected at the tank, increased the gravity of risk involving any incidents like that of the maxicab mishap on December last. In all 31 people lost their lives in the incident, that mooted for safety measures around the lakes and tanks in the district.

One-way

As a result the particular stretch has been made one way for the vehicles coming from Nanjangud to Mysore, till the works are completed. The vehicles coming towards the city have to turn left at Dadadahalli, reach Mysore through Ramabai Nagar, according to south police.

Narendra Modi or Rahul Gandhi? Who will win the battle royale of the Lok Sabha Elections 2019


Get real-time news updates, views and analysis on Lok Sabha Elections 2019 on Deccanherald.com/news/lok-sabha-elections-2019 


Like us on Facebook or follow us on Twitter and Instagram with #DHPoliticalTheatre for live updates on the Indian general elections 2019.

Liked the story?

  • 0

    Happy
  • 0

    Amused
  • 0

    Sad
  • 0

    Frustrated
  • 0

    Angry