<p> Chief Minister Siddaramaiah on Saturday laid the foundation stone for two flyovers and an underpass as part of developing the West of Chord Road as a signal-free corridor.<br /><br /></p>.<p>The flyovers are coming up on Manjunath Nagar Main Road and Basaveshwar Nagar First Main Road. The underpass will connect Shivanagar First Main Road and 8th Main Road. The two-way flyover at Manjunath Nagar Main Road will be 232-metres long, while the one-way flyover at Basaveshwar Nagar will be 388-metres long. The underpass will be 630-metres long. These projects will be taken up at an estimated cost of Rs 89.86 crore under the Mukhyamantri Nagarotthana scheme, which will be completed in 18 months.</p>
<p> Chief Minister Siddaramaiah on Saturday laid the foundation stone for two flyovers and an underpass as part of developing the West of Chord Road as a signal-free corridor.<br /><br /></p>.<p>The flyovers are coming up on Manjunath Nagar Main Road and Basaveshwar Nagar First Main Road. The underpass will connect Shivanagar First Main Road and 8th Main Road. The two-way flyover at Manjunath Nagar Main Road will be 232-metres long, while the one-way flyover at Basaveshwar Nagar will be 388-metres long. The underpass will be 630-metres long. These projects will be taken up at an estimated cost of Rs 89.86 crore under the Mukhyamantri Nagarotthana scheme, which will be completed in 18 months.</p>