Structural problems slowing India's battery production scheme: Study
The study noted that ACC PLI scheme, launched to reduce dependency on import and encourage electric vehicle adoption, sought to achieve manufacturing capacity of 50 GWh but at the end of October 2025 progress under the scheme was limited to 1.4 GWh of the targeted capacity and another 10 GWh under development.