<p>The Bangalore Metro Rail Corporation Limited (BMRCL) on Thursday conducted the trial run of its Green Line train, consisting of three cars.<br /><br /></p>.<p>It ran along the Green Line viaduct from Peenya depot towards the Peenya village station. The track is part of the North-South corridor of Reach-3 (the 12.4-km stretch from Sampige Road in Malleswaram to Nagasandra near Peenya) of the Namma Metro. <br /><br />Once the corridor is ready, passengers can travel on the Metro along this route.<br /><br />Since June this year, the BMRCL ran several trial runs of individual coaches of the Green Line train on the 1.2-km trial track within the Peenya depot.</p>
<p>The Bangalore Metro Rail Corporation Limited (BMRCL) on Thursday conducted the trial run of its Green Line train, consisting of three cars.<br /><br /></p>.<p>It ran along the Green Line viaduct from Peenya depot towards the Peenya village station. The track is part of the North-South corridor of Reach-3 (the 12.4-km stretch from Sampige Road in Malleswaram to Nagasandra near Peenya) of the Namma Metro. <br /><br />Once the corridor is ready, passengers can travel on the Metro along this route.<br /><br />Since June this year, the BMRCL ran several trial runs of individual coaches of the Green Line train on the 1.2-km trial track within the Peenya depot.</p>