Power generation in the 210 MW capacity first unit of Raichur Thermal Power Station (RTPS) was suspended on Thursday following a technical snag.
The officials stopped the power generation as they noticed leakage in a boiler tube. Repair work has been taken up.
Now, the RTPS is generating 1,375 MW of power, the officials added.
(Published 26 April 2018, 18:10 IST)